
The valve was transported from Roma Fiumicino to the Middle East, weighing over 20 tons and standing over 3 meters tall. Transporting this oversized equipment required specialized planning. Utilizing Antonov Airlines AN-124-100 to carry the shipment, an external ramp and crane were required for loading. The valve was secured using an additional metal frame and super-strong shackles for lashing. Time was critical to ensure timely delivery; any delay could halt extraction operations. Air Partner collaborated closely with Gruber Logistics Italy and Alha Group to meet the deadline.
Read more: https://www.airpartner.com/en/about-us/news/air-partner-facilitates-urgent-cargo-delivery-for-leading-energy-client/




